AQUANATOR — 5KW (2002)
Installed at Lynnmouth, North DevonInstalled at the Clarence River, New South Wales, Australia.
03
SEAFLOW — 300KW (2003)
Installed at Lynnmouth, North Devon.
08
NEREUS — 150KW (2008)
Installed at San Remo, Victoria, Australia.
08
SEAGEN — 1.2MW (2008)
Installed at Strangford Lough, Northern Ireland.
09
SOLON TURBINE — 400KW (2009)
Tow Tested Bell Bay, Tasmania, Australia.
10
AK1000 — 1MW (2010)
Installed at the European Marine Energy Centre, Scotland
11
AR1000 — 1MW (2011)
Deployed at European Marine Energy Centre, Scotland.
15
ATLANTIS ACQUISITION OF MARINE CURRENT TURBINES LIMITED FROM SIEMENS (APRIL 2015)
16
MEYGEN — FIRST POWER (NOVEMBER 2016)
The first Andritz Hydro Hammerfest turbine at the MeyGen project is successfully installed and connected to the grid.
17
AR1500 — 1.5MW (2017)
Deployed at MeyGen as part of the 6MW array
18
MEYGEN — 6MW Operational Status (February 2018)
18
Uskmouth Power Station acquired
19
GHR Aquired
20
SEAGEN — 500KW (2020)
Built under license in Wuhan, China and Installed Zhoushan archipelago
21
AR500 — 500KW (2021)
Full system installed with first power in January 2021 Naru Strait, Japan